Location: Jordan
Client: Zara Ghor Haditha
Consultants: Associated Consulting Engineers (ACE)
Project Description
A 32Km, 2-lane highway, in an extensively rough terrain; it encompasses the design and construction of reinforced concrete bridges, 94 storm water drainage structures, retaining walls and extensive protection concrete and gabion protection works.
The project includes a pre-stressed concrete stay bridge
140m long and 13.5 wide, carried by two concrete towers central span, 80m and 30m end spans. The bridge is founded on 40 concrete pored piles, 1.20m in diameter and 25m deep.
Consultancy Services
The engineering services included:
- Redesign of most of the highway
- Construction supervision
- Quality control and material testing
- Contract management and administration