Location: Jordan
Client: Ministry of Public Works
Consultants: Associated Consulting Engineers
Project Description
A primary highway connecting Thagret Asfour with the existing bridge on Zarqa River, forming a part of Irbid-Amman main highway.
The project is an 18 km 4-lane divided highway, with inner and outer shoulders, of 22.8 m width; and involved the following components:
- Five bridges;
- 70 m twin tunnels accommodating two-lane carriageways each;
- Retaining structures;
- Stormwater drainage;
- Pipe and box culverts;
- Traffic markings;
- Signage and safety
Consultancy Services
The engineering services included contract administration, assessment of contract documents; redesign; complete supervision, quality control and materials testing, monitoring and reporting on progress, checking and approval of payment certificates and substantial and final completion certificates.