Location: Lebanon
Client: Council for Development and Reconstruction (CDR)
Consultants: Associated Consulting Engineers (ACE)
Project Description
The project encompasses the design and supervision of the coastal north and south highways of which 13 km are in the north (Chekka-Tripoli) and 27 km in the south (Khaldeh-Jieh).
The overall width of the highway is 24 m 2x3 lanes. “Opposite Systems” was used with 58-meter spacing.
The projects included the provision a complete lighting network consisting of directly buried cables of 4x25 mm², 14-m high galvanized steel poles with high pressure sodium luminaries (IP 65) controlled by photo-electrical cells with backup timers installed at each feeder pillar.
Consultancy Services
Consulting services included:
- Design Criteria
- Preparation of Tender Documents
- Tender Evaluation
- Supervision of construction works
- Contract Management
- Defect Liability Period