Project Description
The study comprises the review of Gibbss's Master Plan for water and wastewater, the determination of the water consumption, sewage flows, the review of Awali water distribution scheme.
The water study comprises 14 kms of transmission main of 250 to 500mm diameter pipes, six service reservoirs, two pumping stations, 110 kms of distribution mains, to serve the Beirut East South and Dekouaneh areas.
The project comprises the study of the major sewer trunk lines that will complete the collection systems into Ghadir and Daoura treatment plants. The study consists of 80 kms of trunk line of which 40 kms will be
carried to final design.
Consultancy Services
The consulting services for this major project included the following main components:
- Master Plan review and update
- Preparation of Tender Documents
- Tender Evaluation
- Supervision of construction works
- Contract Management
- Operation and Maintenance Period